BUYER GUIDE · October 10, 2026 · Sanzhu Engineering Team
The fastest quotes come from the most complete RFQs. Every missing detail — material, quantity, tolerance — costs a round of clarification emails and days of delay. Worse, quoting against guesses produces prices that change later. Here is the checklist our engineers wish every buyer would follow before hitting send.
1. A drawing with dimensions and tolerances
This is the foundation of the whole quote. A 2D drawing in PDF or DWG should show the full profile with ID, cross-section or outer dimensions, tolerances on critical dimensions, and any surface-finish or flash requirements. Mark which surfaces seal — it tells us where the parting line must not land. No drawing? A physical sample works: we can measure it and reverse-engineer the dimensions, though tolerances will then need your confirmation.
2. Material and hardness
Name the compound — NBR, FKM, EPDM, silicone, polyurethane — and the hardness in Shore A. If you are unsure, describe the fluid and temperature range instead and let us recommend the compound; that is a normal part of our quoting process. Also mention any compliance needs up front, such as food-contact or drinking-water suitability, since compliant compounds cost differently.
3. Operating conditions
Four facts prevent most material mismatches: the fluid the seal will touch, the temperature range it will see, the pressure, and whether the seal is static or dynamic. A seal for a static flange and a seal for a reciprocating rod may share a drawing but need completely different compounds — this section is what keeps the wrong rubber out of your application.
4. Quantity and delivery
State both the first-order quantity and the expected annual volume. Tooling cost, unit price, and even the recommended molding process all shift with volume — a 500-piece order and a 500,000-piece program are quoted differently for good reason. Add your target delivery date so lead time is planned rather than promised blindly.
5. Quality and packaging requirements
If you need dimensional inspection reports, material certificates, or specific test data with each shipment, say so in the RFQ — it affects the price and must be planned into production. The same goes for special packing, labeling, or barcoding. Requirements discovered after the quote are the ones that cause friction later.
What slows a quote down
The most common delay is a drawing without tolerances — the supplier has to ask which dimensions are critical before tooling can even be estimated. Next is "material TBD": without a compound, the price range between NBR and FFKM can span an order of magnitude, so no meaningful number is possible. Missing quantities force the same problem on tooling amortization. And photos of a part with no scale reference cannot be measured reliably. Each of these triggers exactly one email round-trip — usually a day or two — so an RFQ missing all four can sit a week before quoting even starts. Ten extra minutes on your RFQ routinely saves ten days on the calendar.
One last tip: put a name and a direct contact on the RFQ. Quotes with questions attached go faster when the engineer can reach the person who knows the application — a generic info@ address adds a relay step to every clarification. The best RFQs read like a brief handover, not a puzzle.
| RFQ item | Why it matters | Example |
|---|---|---|
| Drawing | Defines geometry and tolerances | PDF/DWG with ID x CS and tolerances |
| Material & hardness | Sets compound and price level | NBR, 70 Shore A |
| Operating conditions | Validates material choice | Hydraulic oil, -30°C to +100°C, dynamic |
| Quantities | Drives tooling and unit price | 10,000 pcs first order, 50,000 / year |
| Quality terms | Plans inspection into production | Dimensional report per batch |
An RFQ with these five sections answered typically gets a priced quote back within a day — and the price you are quoted is the price that holds.



